OK, I can't wait.
My GTP was supposed to have been finished in the factory on 9 July 2003, before being shipped to Brisbane.
Has anyone at the factory seen it?
I think that I've driven my Ford Dealer crazy by my repeated phone calls to see how the GTP was progressing.
Thanks!
My GTP was supposed to have been finished in the factory on 9 July 2003, before being shipped to Brisbane.
Has anyone at the factory seen it?
I think that I've driven my Ford Dealer crazy by my repeated phone calls to see how the GTP was progressing.
Thanks!